Tiny Village - Lloyd Grading & Utilities

Project Details

Project Dates
09/01/2019 - 06/01/2023
Services Provided

  • Site Development
  • Grading and Excavating
  • Stormwater Management
  • Underground Utilities
  • Utility Connections

Project Scope

Install all infrastructure including erosion control, storm drainage, water, septic system, grading, and paving the entire site. The site consisted of 16 tiny homes which were served by a community septic system.

Challenges

  • Water Main Along Roadway: Extending the county water system to the site by installing 3000 of water main along the roadway.
  • Utility Installation Near Critical Infrastructure: Working around existing gravity and pressurized sewer mains. These existing sewer lines caused multiple stops and starts. This involved working diligently with the county and engineer to come up with a solution and installing the water main at various different depths to create the required separation by NCDEQ.

Outcome

The water main was installed to the site and accepted by the county and state allowing the occupants at tiny village to move in.

Let's Build Stronger Foundations Together

At Lloyd Grading & Utilities, Inc., we’ve provided full-service site preparation since 2006.  We’re committed to delivering infrastructure solutions that stand the test of time.

Contact us today to discuss your project needs and experience the difference of working with a local, family-owned industry leader.

Contact Us
foundation1 foundation2